The master plan.
Building the tono.
Steam-bending the khana slats.
Instructor Ian beginning assembly of the khana.
Knot-tying.
Working on the khana.
One completed collapsed khana!
Completed roof poles, tapered and knotted.
Fitting the khana together.
Tension strap in place.
Two khana fitted together.
Constructing the super-fancy tono.
Some good books.
Top of the door frame, with one roof-pole socket partially drilled out.
Tapering the edges of the tono segments where the Lexan panes will sit.
The adhesive used to glue the Lexan to the wood.
Sewing Sam.
Ian fitting the walls.
Peek-a-boo.
Ross demonstrating wall height.
A truly amazing place.
Solo dinner at the Gunfint Tavern with a good book and some dry wine.
Rain on campus.
Ingenius door latch.
Door latch from the outside.
Completed door, swinging inward.